Copper Lead And Zinc Smelting Plant Setup
File for metal smelting plant setup with confidence. I-Pro Solutions provides step-by-step guidance, document checklists, fee breakdown and online submission for.
Dedicated specialist
CA-led, named point of contact
Tracked client portal
Real-time status, end-to-end
Money-back accuracy
Refile-free if our error
Flat-fee pricing
No hidden charges, ever
About this service
Copper Lead And Zinc Smelting Plant Setup is a key regulatory filing administered by MoEFCC for EC (Category A โ EAC-1 Industry). Co-regulators: CPCB (emission/effluent norms); State Pollution Control Board (Consents + Hazardous Waste Authorisation); Indian Bureau of Mines (IBM) for captive mine plan approval; DGMS for mine safety; AERB for radioactive by-products; Central Ground Water Authority (CGWA) for groundwater abstraction NOC.. Filing is executed via Same as Carbon Black โ Form 1, Form 1A, Form 1M, TOR Application, EIA/EMP Report, Form 4 (compliance). Additionally: under **Environment (Protection) Act, 1986** + **EIA Notification 2006** (S.O. 1533 dated 14.09.2006) โ Schedule 1 **Item 3(a): "Primary Metallurgical Industry (notified processing routes)"** โ Category A. The "notified processing routes" include: copper smelting (โฅ50,000 TPA), lead smelting (โฅ50,000 TPA), zinc smelting (โฅ50,000 TPA), aluminium smelting (โฅ2,00,000 TPA โ separate sub-category). **Environment (Protection) Rules, 1986 โ Schedule I** (industry-specific emission/effluent standards for non-ferrous metallurgical industries โ Notification G.S.R. 176(E) dated 02.04.1992, revised 2008, 2016). **Water (Prevention and Control of Pollution) Act, 1974** โ Section 25. **Air (Prevention and Control of Pollution) Act, 1981** โ Section 21. **Hazardous and Other Wastes (Management and Transboundary Movement) Rules, 2016** โ Rule 5 (authorisation for hazardous wastes โ arsenic trioxide, lead slag, zinc dross, copper slag). **Public Liability Insurance Act, 1991**. **Mines and Minerals (Development and Regulation) Act, 1957** โ Section 4 (captive mining lease if integrated with captive mine). **Atomic Energy Act, 1962** โ for any monazite / rare earth by-products (AERB approval). **Mines Act, 1952** + Coal Mines Regulations 2017 โ Directorate General of Mines Safety (DGMS) approval for captive mine.. Our specialist-led team ensures full compliance with statutory documentation, eligibility verification, and expedited government approval.
Eligibility & thresholds
- Valid identity & address proof of applicant
- Active PAN & registered business premises
- Authorized representative authorization
- Compliant under applicable regulatory laws
- No pending statutory disqualifications
- Valid across authorized operational jurisdictions
- Pre-filing statutory documentation verification
- Official statutory fee schedule as per authority
- Mandatory periodic compliance filings post-approval
What's included
Everything in one transparent fee โ no add-ons, no surprises.
Government charges only โ separate from I-Pro's professional fee. All figures verified as of 25 August 2026.
| Fee Component | Amount (โน) | Basis / Authority |
|---|---|---|
| Copper Lead And Zinc Smelting Plant Setup Statutory Fee | โน1,00,000 - โน5,00,000 | Official government fee schedule (separate from professional fee)Statutory Authority |
| Total Government Fee | โน1,00,000 - โน5,00,000 | (for default assumptions stated below) |
Government charges only โ separate from I-Pro's professional fee. Verified 25 August 2026.
Required documents
Each list identifies exactly what to provide โ and what you do not need to submit. Use the accordions to expand.
- โบSame composite set as Carbon Black (PAN, GSTIN, constitution, project report, site documents, EIA, E โ Same composite set as Carbon Black (PAN, GSTIN, constitution, project report, site documents, EIA, EMP, public hearing report, CGWA NOC). Additionally:
- โบMining Lease grant order (if captive mine). โ Mining Lease grant order (if captive mine).
- โบMining Plan approval from IBM. โ Mining Plan approval from IBM.
- โบDGMS Mine Safety approval. โ DGMS Mine Safety approval.
- โบHazardous Waste Authorisation Form 1 from SPCB. โ Hazardous Waste Authorisation Form 1 from SPCB.
- โบInventory of hazardous by-products (arsenic, lead, zinc dross, slag). โ Inventory of hazardous by-products (arsenic, lead, zinc dross, slag).
- โบAERB NOC (if monazite/rare earth by-products present). โ AERB NOC (if monazite/rare earth by-products present).
- โบPublic Liability Insurance for hazardous chemical handling. โ Public Liability Insurance for hazardous chemical handling.
- โบTechnology licence agreement (if foreign technology imported). โ Technology licence agreement (if foreign technology imported).
How it works
Each step is labelled with who performs it โ Customer, I-Pro, or the Regulator. Form names are linked to the official portal.
- 1Customerโฑ Day 1
Requirement Review & Eligibility Check
Initial consultation to verify statutory eligibility and compile required prerequisites. - 2I-Proโฑ Day 1โ2
Document Verification & Pre-Scrutiny
Comprehensive audit of applicant KYC, business records, and address proofs. - 3I-Proโฑ Day 2โ3
Statutory Form Preparation & Drafting
Drafting official application forms, affidavits, and supporting declarations. - 4I-Proโฑ Day 3โ4
Submission on Competent Portal
Electronic filing on official department portal with fee payment and receipt generation. - 5Regulatorโฑ Day 4โ7
Authority Scrutiny & Liaison
Tracking department scrutiny, responding to officer queries, and milestone alerts. - 6Governmentโฑ Day 7โ10
Final Approval & Certificate Delivery
Official statutory certificate delivery along with ongoing compliance guidance.
Post-registration compliance
What to file next. I-Pro handles these as part of the annual compliance package.
| Filing | Form | Deadline |
|---|---|---|
| Commencement of Business (Form INC-20A) Penalty: โน50,000 for company + โน1,000/day for directors (max โน1 Lakh) | One-time mandatory | Within 180 days of incorporation after bank capital deposit |
| First Auditor Appointment (Form ADT-1) Penalty: Statutory non-compliance; prosecution of defaulting officers | 5-year tenure | Within 30 days of incorporation by Board of Directors |
| Annual Financial Statements (Form AOC-4) Penalty: โน100 per day of delay per form with no statutory ceiling | Annual | Within 30 days of AGM (by 29 October annually) |
| Annual Return (Form MGT-7) Penalty: โน100 per day of delay per form with no statutory ceiling | Annual | Within 60 days of AGM (by 29 November annually) |
| Director KYC Verification (DIR-3 KYC) Penalty: โน5,000 statutory fee per DIN + deactivation | Annual | Every designated partner / director holding active DIN by 30 September |
Penalties for non-compliance
Statutory penalties under governing regulatory provisions. Avoid non-compliance delays.
| Non-compliance | Provision | Penalty |
|---|---|---|
| Commencement of Business (Form INC-20A) | One-time mandatory | โน50,000 for company + โน1,000/day for directors (max โน1 Lakh) |
| First Auditor Appointment (Form ADT-1) | 5-year tenure | Statutory non-compliance; prosecution of defaulting officers |
| Annual Financial Statements (Form AOC-4) | Annual | โน100 per day of delay per form with no statutory ceiling |
| Annual Return (Form MGT-7) | Annual | โน100 per day of delay per form with no statutory ceiling |
| Director KYC Verification (DIR-3 KYC) | Annual | โน5,000 statutory fee per DIN + deactivation |
Common mistakes to avoid
Avoidable filing errors that cause delays or rejection. Each can be resolved before submission.
- 1Mismatched applicant legal name or identity details across KYC proofsWhy: Government verification APIs cross-check with UIDAI and MCA databases and automatically flag discrepancies in spelling or dates.Fix: Our specialists pre-validate your documents against official government databases before portal filing.
- 2Submitting outdated utility bills or non-notarized commercial leasesWhy: Premises proofs older than 60 days or defective landlord NOCs trigger statutory scrutiny queries and multi-week processing delays.Fix: We verify recent billing dates and provide pre-formatted, legally vetted landlord NOC and lease formats.
- 3Selecting incorrect classification, turnover slab, or statutory activity codeWhy: Applications filed under inappropriate classifications attract show-cause notices and potential rejection without statutory fee refund.Fix: We conduct a statutory scope assessment to align your application with the exact regulatory requirements.
Frequently asked questions
Everything you need to know about this service.
Client feedback
What clients say
Real reviews from founders, finance leads and operators who used our Copper Lead And Zinc Smelting Plant Setup service.
No reviews yet
Be the first to share your experience with Copper Lead And Zinc Smelting Plant Setup.
Recommended Bundles
Instead of buying these services separately, get them together as a package.
Heavy Industry Premium Pack
Carbon black / heavy industry + Factory + BOCW + ISO 14001 + ISO 45001 + PESO โ full industrial compliance.
What's included
Green Industry Growth Pack
Green hydrogen + Renewable energy business + ISO 14001 + ISO 50001 + Factory license.
What's included
Plant Setup Starter Pack
Factory license + BOCW + Trade license โ minimum plant setup compliance.
What's included