Factory License
Get professional Factory License services with I-Pro Solutions. Transparent fees, fast turnaround, expert guidance.
Dedicated specialist
CA-led, named point of contact
Tracked client portal
Real-time status, end-to-end
Money-back accuracy
Refile-free if our error
Flat-fee pricing
No hidden charges, ever
About this service
Factory License provides statutory compliance and legal protection under the governing regulatory frameworks in India. Our specialist CA/CS team handles document drafting, eligibility verification, and direct authority filings from initiation to final certification.
Eligibility & thresholds
- Valid identity & address proof of applicant
- Active PAN & registered business premises
- Authorized representative authorization
- Compliant under applicable regulatory laws
- No pending statutory disqualifications
- Valid across authorized operational jurisdictions
- Pre-filing statutory documentation verification
- Official statutory fee schedule as per authority
- Mandatory periodic compliance filings post-approval
What's included
Everything in one transparent fee β no add-ons, no surprises.
Government charges only β separate from I-Pro's professional fee. All figures verified as of 25 August 2026.
| Fee Component | Amount (βΉ) | Basis / Authority |
|---|---|---|
| Factory License Statutory Fee | βΉ500 | Official government fee schedule (separate from professional fee)Statutory Authority |
| Total Government Fee | βΉ500 | (for default assumptions stated below) |
Government charges only β separate from I-Pro's professional fee. Verified 25 August 2026.
Required documents
Each list identifies exactly what to provide β and what you do not need to submit. Use the accordions to expand.
- βΊ**PAN of proprietor / firm / company**; β **PAN of proprietor / firm / company**;
- βΊ**Aadhaar of proprietor / directors / partners**; β **Aadhaar of proprietor / directors / partners**;
- βΊ**Plan Approval Letter** β issued under s.8 Factories Act by the Chief Inspector (Form 3 β approval β **Plan Approval Letter** β issued under s.8 Factories Act by the Chief Inspector (Form 3 β approval letter); this is a precondition to licence application;
- βΊ**Factory building plan** β site plan, layout plan, elevation, cross-section, machinery layout (draw β **Factory building plan** β site plan, layout plan, elevation, cross-section, machinery layout (drawn by a registered architect / engineer) β submitted at the plan approval stage;
- βΊ**List of machinery** with installed capacity, horsepower, location in factory; β **List of machinery** with installed capacity, horsepower, location in factory;
- βΊ**Manufacturing process flow chart** β describing the process, raw materials, finished products, by- β **Manufacturing process flow chart** β describing the process, raw materials, finished products, by-products, hazardous chemicals (if any);
- βΊ**List of workers** β expected number per shift; β **List of workers** β expected number per shift;
- βΊ**Proof of possession of premises** β sale deed / lease deed / rental agreement / NOC from owner; β **Proof of possession of premises** β sale deed / lease deed / rental agreement / NOC from owner;
- βΊ**Property tax receipt** (some States); β **Property tax receipt** (some States);
- βΊ**MOA / AOA / Certificate of Incorporation** + Board Resolution nominating the "occupier" (mandatory β **MOA / AOA / Certificate of Incorporation** + Board Resolution nominating the "occupier" (mandatory under s.7[n] β the occupier must be a director / partner in case of company / partnership);
- βΊ**NOC from Pollution Control Board** under Water (Prevention and Control of Pollution) Act 1974 and β **NOC from Pollution Control Board** under Water (Prevention and Control of Pollution) Act 1974 and Air (Prevention and Control of Pollution) Act 1981;
- βΊ**NOC from Fire Department** under State Fire Service Act (Maharashtra Fire Prevention and Life Safe β **NOC from Fire Department** under State Fire Service Act (Maharashtra Fire Prevention and Life Safety Measures Act 2006 β for factories >500 sq m);
- βΊ**NOC from Electrical Inspector** under Indian Electricity Rules 1956 (for installations >100 kW); β **NOC from Electrical Inspector** under Indian Electricity Rules 1956 (for installations >100 kW);
- βΊ**Building Stability Certificate** from a structural engineer (some States). β **Building Stability Certificate** from a structural engineer (some States).
How it works
Each step is labelled with who performs it β Customer, I-Pro, or the Regulator. Form names are linked to the official portal.
- 1I-Proβ± 1 - 3 Days
Step 1: **I-Pro**
- 2I-Proβ± 1 - 3 Days
Step 2: **I-Pro / Architect**
- 3I-Proβ± 1 - 3 Days
Step 3: **I-Pro**
- 4I-Proβ± 1 - 3 Days
Step 4: **DISH**
- 5I-Proβ± 1 - 3 Days
Step 5: **I-Pro**
- 6I-Proβ± 1 - 3 Days
Step 6: **Applicant**
- 7I-Proβ± 1 - 3 Days
Step 7: **DISH**
- 8I-Proβ± 1 - 3 Days
Step 8: **DISH**
- 9I-Proβ± 1 - 3 Days
Step 9: **I-Pro**
- 10I-Proβ± 1 - 3 Days
Step 10: **I-Pro**
Post-registration compliance
What to file next. I-Pro handles these as part of the annual compliance package.
| Filing | Form | Deadline |
|---|---|---|
| Timely Statutory Renewal Penalty: Non-renewal leads to cancellation or statutory fines. | Periodic | Mandatory periodic renewal per regulator guidelines. |
Penalties for non-compliance
Statutory penalties under governing regulatory provisions. Avoid non-compliance delays.
| Non-compliance | Provision | Penalty |
|---|---|---|
| Timely Statutory Renewal | Periodic | Non-renewal leads to cancellation or statutory fines. |
Common mistakes to avoid
Avoidable filing errors that cause delays or rejection. Each can be resolved before submission.
- 1Mismatched applicant legal name or identity details across KYC proofsWhy: Government verification APIs cross-check with UIDAI and MCA databases and automatically flag discrepancies in spelling or dates.Fix: Our specialists pre-validate your documents against official government databases before portal filing.
- 2Submitting outdated utility bills or non-notarized commercial leasesWhy: Premises proofs older than 60 days or defective landlord NOCs trigger statutory scrutiny queries and multi-week processing delays.Fix: We verify recent billing dates and provide pre-formatted, legally vetted landlord NOC and lease formats.
- 3Selecting incorrect classification, turnover slab, or statutory activity codeWhy: Applications filed under inappropriate classifications attract show-cause notices and potential rejection without statutory fee refund.Fix: We conduct a statutory scope assessment to align your application with the exact regulatory requirements.
Frequently asked questions
Everything you need to know about this service.
Client feedback
What clients say
Real reviews from founders, finance leads and operators who used our Factory License service.
No reviews yet
Be the first to share your experience with Factory License.
Recommended Bundles
Instead of buying these services separately, get them together as a package.
Industrial Premises Premium Pack
Factory + Building NOC + Fire + BOCW + Trade license + ISO 45001 β full industrial premises compliance.
What's included
Premises Compliance Growth Pack
Factory license + Building NOC + Trade license + Shop establishment + Legal metrology.
What's included
Local Licenses Starter Pack
Shop establishment + Trade license + Health trade license β minimum to open a shop.