Skip to main content
Editor's pickStartup

Fire Equipment Plant Setup

Fire Equipment Plant Setup requires precise documentation and timely submission. I-Pro Solutions manages the complete workflow including fire plant setup India and.

Turnaround
7–14 Working Days
β‚Ή
Starts from
β‚Ή32,999
Money-back accuracy
Guaranteed
Total starting from
β‚Ή32,999
Professional + estimated government fee
Professional feeβ‚Ή22,999 starts with
Government fee (est.)β‚Ή10,000 - β‚Ή50,000
Turnaround7–14 Working Days
Money-back accuracy. CA/CS specialist. Tracked client portal.
WhatsApp
CONFIRMEDverified 25 Aug 2026

Dedicated specialist

CA-led, named point of contact

Tracked client portal

Real-time status, end-to-end

Money-back accuracy

Refile-free if our error

Flat-fee pricing

No hidden charges, ever

About this service

Fire Equipment Plant Setup is a key regulatory filing administered by Petroleum and Explosives Safety Organisation (PESO), under Department for Promotion of Industry and Internal Trade (DPIIT), Ministry of Commerce & Industry. Head office: Nagpur. Regional offices at Agra, Chennai, Kolkata, Mumbai, Vadodara. Co-regulators: State Chief Inspector of Factories (Factories Act 1948); State Pollution Control Board (Water Act 1974, Air Act 1981); BIS (BIS Act 2016) for ISI-mark certification; CPCB for hazardous chemical handling.. Filing is executed via - For gas cylinder manufacture/filling under **Gas Cylinder Rules, 2016**: **Form B** (Application for licence to fill or compress gas in cylinders) and **Form C** (Licence to fill or compress gas in cylinders). under **Explosives Act, 1884** (Act 4 of 1884) β€” Section 6 (licensing for manufacture of explosives), Section 7 (place of manufacture), **Explosives Rules, 2008** (GSR 660(E)). **Petroleum Act, 1934** (Act 30 of 1934) β€” Section 4 (prohibition of import/transport/storage without licence); **Petroleum Rules, 2002**. **Static and Mobile Pressure Vessels (Unfired) Rules, 1981** (SMPV) under Petroleum Act 1934 β€” for storage of LPG/nitrogen/CO2 above threshold quantities. **Gas Cylinder Rules, 2016** (G.S.R. 713(E) dated 14.09.2016) β€” manufacture/filling of gas cylinders. **Environment (Protection) Act, 1986** + EIA Notification 2006 (Schedule 1 Item 4(b) covers hazardous chemical plants; fire-equipment manufacturing with cylinder filling may attract Schedule 1 Item 7(d) for hazardous chemicals). **Factories Act, 1948** β€” Section 6 (approval of factory plans), Section 7 (licensing by State Chief Inspector of Factories). **Bureau of Indian Standards Act, 2016** β€” IS 2171 (portable fire extinguishers, CO2 type), IS 940 (soda-acid type), IS 2878 (water-type extinguisher), IS 15683 (BC/ABC dry powder), IS 14609 (DCP cartridge-operated), IS 2878-2004 β€” Quality Control Orders (QCOs) notified by DPIIT make BIS certification mandatory for fire extinguishers sold in India.. Our specialist-led team ensures full compliance with statutory documentation, eligibility verification, and expedited government approval.

Eligibility & thresholds

Minimum
  • Valid identity & address proof of applicant
  • Active PAN & registered business premises
  • Authorized representative authorization
Maximum
  • Compliant under applicable regulatory laws
  • No pending statutory disqualifications
  • Valid across authorized operational jurisdictions
Statutory floor
  • Pre-filing statutory documentation verification
  • Official statutory fee schedule as per authority
  • Mandatory periodic compliance filings post-approval

What's included

Everything in one transparent fee β€” no add-ons, no surprises.

Investor-Centric AOA Drafting
If you plan to raise institutional funding, standard Articles of Association (AOA) will not suffice. Venture capitalists demand specific clauses regarding right of first refusal (ROFR), tag-along/drag-along rights, and anti-dilution provisions. Our elite corporate lawyers draft sophisticated AOAs that anticipate future funding rounds, preventing costly and time-consuming structural overhauls when you secure term sheets.
Complex Multi-Founder Structuring
Co-founder disputes are the leading cause of early-stage startup failure. We don't just register your company; we advise on optimal equity splits, director roles, and authorized capital distribution. We provide templates for Co-Founder Agreements and vesting schedules, ensuring that the foundational relationship between partners is legally documented and aligned for long-term stability.
Rapid SPICe+ Processing Engine
Time is of the essence for startups. We utilize an advanced compliance engine that preemptively validates all data entered into the SPICe+ (INC-32) form. By cross-referencing PAN databases, checking DIN eligibility, and formatting registered office proofs perfectly, we eliminate typographical errors that typically cause frustrating ROC resubmission delays, ensuring first-pass approval.
Strategic Authorized Capital Advisory
Determining your initial Authorized Share Capital is a delicate balance. Set it too low, and you'll immediately face high fees to increase it during your first seed round. Set it too high, and you pay unnecessary upfront government stamp duty. We analyze your 12-to-18-month funding roadmap to recommend the exact optimal capital structure that minimizes immediate costs while accommodating your immediate growth.
ESOP Implementation Framework
Attracting top-tier talent in the startup ecosystem often requires offering Employee Stock Ownership Plans. A Private Limited Company is the only structure that efficiently supports this. As part of our premium advisory, we structure your initial cap table to accommodate a future ESOP pool seamlessly, ensuring you are ready to incentivize your founding team.
Comprehensive Post-Incorporation Toolkit
Receiving the Certificate of Incorporation is just the starting line. Within the first 30 to 180 days, you must open a bank account, appoint a statutory auditor (ADT-1), and file the Commencement of Business (INC-20A). We provide a complete post-incorporation execution service, handling these mandatory compliance milestones so you can focus entirely on product development and sales.
Government Fee Breakdown

Government charges only β€” separate from I-Pro's professional fee. All figures verified as of 25 August 2026.

Fee ComponentAmount (β‚Ή)Basis / Authority
Fire Equipment Plant Setup Statutory Feeβ‚Ή10,000 - β‚Ή50,000Official government fee schedule (separate from professional fee)Statutory Authority
Total Government Feeβ‚Ή10,000 - β‚Ή50,000(for default assumptions stated below)

Government charges only β€” separate from I-Pro's professional fee. Verified 25 August 2026.

Required documents

Each list identifies exactly what to provide β€” and what you do not need to submit. Use the accordions to expand.

  • β€ΊEntity PAN + GSTIN. β€” Entity PAN + GSTIN.
  • β€ΊConstitution document β€” Partnership Deed / MoA & AoA / LLP Agreement / Certificate of Incorporation. β€” Constitution document β€” Partnership Deed / MoA & AoA / LLP Agreement / Certificate of Incorporation.
  • β€ΊTitle/lease document for manufacturing premises (β‰₯30 metres from any residential building for hazard β€” Title/lease document for manufacturing premises (β‰₯30 metres from any residential building for hazardous gas filling).
  • β€ΊSite plan and building plan approved by local authority. β€” Site plan and building plan approved by local authority.
  • β€ΊLayout of cylinder filling area, storage yard, fire-fighting system. β€” Layout of cylinder filling area, storage yard, fire-fighting system.
  • β€ΊProcess flow diagram with hazardous materials inventory. β€” Process flow diagram with hazardous materials inventory.
  • β€ΊList of equipment with safety devices (pressure relief valves, rupture discs). β€” List of equipment with safety devices (pressure relief valves, rupture discs).
  • β€ΊCompetent person certificates for pressure vessels (under SMPV Rules 1981 Rule 4). β€” Competent person certificates for pressure vessels (under SMPV Rules 1981 Rule 4).
  • β€ΊNOC from State Fire Service / Fire Advisor. β€” NOC from State Fire Service / Fire Advisor.
  • β€ΊConsent to Establish from State Pollution Control Board under Water Act 1974 + Air Act β€” Consent to Establish from State Pollution Control Board under Water Act 1974 + Air Act
  • β€ΊFactory Licence from State Chief Inspector of Factories (Form 2 under Factories Act 1948). β€” Factory Licence from State Chief Inspector of Factories (Form 2 under Factories Act 1948).
  • β€ΊAuthorised signatory details with Aadhaar/PAN. β€” Authorised signatory details with Aadhaar/PAN.

How it works

Each step is labelled with who performs it β€” Customer, I-Pro, or the Regulator. Form names are linked to the official portal.

  1. 1
    Customer⏱ 1 - 3 Days

    Step 1: **I-Pro / Customer**

    **I-Pro / Customer**: Identify type of fire-equipment manufacturing (cylinders, extinguishers, sprinklers, gas filling, etc.).
  2. 2
    I-Pro⏱ 1 - 3 Days

    Step 2: **I-Pro**

    **I-Pro**: Apply for **land use approval** β€” local development authority / MIDC / State Industrial Corporation.
  3. 3
    I-Pro⏱ 1 - 3 Days

    Step 3: **I-Pro**

    **I-Pro**: Apply for **Factory Licence** β€” State Chief Inspector of Factories (Form 1 plan approval; Form 2 licence).
  4. 4
    I-Pro⏱ 1 - 3 Days

    Step 4: **I-Pro**

    **I-Pro**: Apply for **Consent to Establish** β€” State Pollution Control Board under Water Act 1974 + Air Act 1981.
  5. 5
    I-Pro⏱ 1 - 3 Days

    Step 5: **I-Pro**

    **I-Pro**: Apply for **PESO Form B (Gas Cylinder Rules)** + **SMPV Form A** + **Petroleum Form XIII** on PESO online portal β€” submit plans and documents.
  6. 6
    I-Pro⏱ 1 - 3 Days

    Step 6: **PESO**

    **PESO**: Scrutinises; conducts **joint inspection** with State Factory Inspector + Explosives Officer.
  7. 7
    I-Pro⏱ 1 - 3 Days

    Step 7: **PESO**

    **PESO**: Issues licences β€” Form C (cylinder filling), SMPV Form B (storage), Form XIII (petroleum) β€” typically valid for **3 years** (renewable).
  8. 8
    I-Pro⏱ 1 - 3 Days

    Step 8: **Customer / I-Pro**

    **Customer / I-Pro**: Apply for **BIS ISI mark** β€” submit type-test samples to BIS-approved lab; BIS conducts factory audit.
  9. 9
    I-Pro⏱ 1 - 3 Days

    Step 9: **BIS**

    **BIS**: Issues **BIS Licence** (CM/L-XXXXX) for fire extinguisher per IS 2171/IS 15683.
  10. 10
    Regulator⏱ 1 - 3 Days

    Step 10: **I-Pro**

    **I-Pro**: Counsel on continuing compliance β€” annual testing of cylinders, SMPV periodic inspection (every 2 years), BIS surveillance.

Post-registration compliance

What to file next. I-Pro handles these as part of the annual compliance package.

FilingFormDeadline
Commencement of Business (Form INC-20A)
Penalty: β‚Ή50,000 for company + β‚Ή1,000/day for directors (max β‚Ή1 Lakh)
One-time mandatoryWithin 180 days of incorporation after bank capital deposit
First Auditor Appointment (Form ADT-1)
Penalty: Statutory non-compliance; prosecution of defaulting officers
5-year tenureWithin 30 days of incorporation by Board of Directors
Annual Financial Statements (Form AOC-4)
Penalty: β‚Ή100 per day of delay per form with no statutory ceiling
AnnualWithin 30 days of AGM (by 29 October annually)
Annual Return (Form MGT-7)
Penalty: β‚Ή100 per day of delay per form with no statutory ceiling
AnnualWithin 60 days of AGM (by 29 November annually)
Director KYC Verification (DIR-3 KYC)
Penalty: β‚Ή5,000 statutory fee per DIN + deactivation
AnnualEvery designated partner / director holding active DIN by 30 September

Penalties for non-compliance

Statutory penalties under governing regulatory provisions. Avoid non-compliance delays.

Non-complianceProvisionPenalty
Commencement of Business (Form INC-20A)One-time mandatoryβ‚Ή50,000 for company + β‚Ή1,000/day for directors (max β‚Ή1 Lakh)
First Auditor Appointment (Form ADT-1)5-year tenureStatutory non-compliance; prosecution of defaulting officers
Annual Financial Statements (Form AOC-4)Annualβ‚Ή100 per day of delay per form with no statutory ceiling
Annual Return (Form MGT-7)Annualβ‚Ή100 per day of delay per form with no statutory ceiling
Director KYC Verification (DIR-3 KYC)Annualβ‚Ή5,000 statutory fee per DIN + deactivation

Common mistakes to avoid

Avoidable filing errors that cause delays or rejection. Each can be resolved before submission.

  1. 1
    Mismatched applicant legal name or identity details across KYC proofs
    Why: Government verification APIs cross-check with UIDAI and MCA databases and automatically flag discrepancies in spelling or dates.
    Fix: Our specialists pre-validate your documents against official government databases before portal filing.
  2. 2
    Submitting outdated utility bills or non-notarized commercial leases
    Why: Premises proofs older than 60 days or defective landlord NOCs trigger statutory scrutiny queries and multi-week processing delays.
    Fix: We verify recent billing dates and provide pre-formatted, legally vetted landlord NOC and lease formats.
  3. 3
    Selecting incorrect classification, turnover slab, or statutory activity code
    Why: Applications filed under inappropriate classifications attract show-cause notices and potential rejection without statutory fee refund.
    Fix: We conduct a statutory scope assessment to align your application with the exact regulatory requirements.

Frequently asked questions

Everything you need to know about this service.

Client feedback

What clients say

Real reviews from founders, finance leads and operators who used our Fire Equipment Plant Setup service.

No reviews yet

Be the first to share your experience with Fire Equipment Plant Setup.

Recommended Bundles

Instead of buying these services separately, get them together as a package.

Premium

Industrial Premises Premium Pack

Factory + Building NOC + Fire + BOCW + Trade license + ISO 45001 β€” full industrial premises compliance.

Individual Totalβ‚Ή50,394
Bundle Priceβ‚Ή42,816
You save β‚Ή7,579 (20%)
Get Started β†’
Growth

Premises Compliance Growth Pack

Factory license + Building NOC + Trade license + Shop establishment + Legal metrology.

Individual Totalβ‚Ή48,894
Bundle Priceβ‚Ή43,675
You save β‚Ή5,220 (15%)
Get Started β†’
Starter

Local Licenses Starter Pack

Shop establishment + Trade license + Health trade license β€” minimum to open a shop.

Individual Totalβ‚Ή37,097
Bundle Priceβ‚Ή34,498
You save β‚Ή2,600 (10%)
Get Started β†’
Call ExpertWhatsApp