Fire Equipment Plant Setup
Fire Equipment Plant Setup requires precise documentation and timely submission. I-Pro Solutions manages the complete workflow including fire plant setup India and.
Dedicated specialist
CA-led, named point of contact
Tracked client portal
Real-time status, end-to-end
Money-back accuracy
Refile-free if our error
Flat-fee pricing
No hidden charges, ever
About this service
Fire Equipment Plant Setup is a key regulatory filing administered by Petroleum and Explosives Safety Organisation (PESO), under Department for Promotion of Industry and Internal Trade (DPIIT), Ministry of Commerce & Industry. Head office: Nagpur. Regional offices at Agra, Chennai, Kolkata, Mumbai, Vadodara. Co-regulators: State Chief Inspector of Factories (Factories Act 1948); State Pollution Control Board (Water Act 1974, Air Act 1981); BIS (BIS Act 2016) for ISI-mark certification; CPCB for hazardous chemical handling.. Filing is executed via - For gas cylinder manufacture/filling under **Gas Cylinder Rules, 2016**: **Form B** (Application for licence to fill or compress gas in cylinders) and **Form C** (Licence to fill or compress gas in cylinders). under **Explosives Act, 1884** (Act 4 of 1884) β Section 6 (licensing for manufacture of explosives), Section 7 (place of manufacture), **Explosives Rules, 2008** (GSR 660(E)). **Petroleum Act, 1934** (Act 30 of 1934) β Section 4 (prohibition of import/transport/storage without licence); **Petroleum Rules, 2002**. **Static and Mobile Pressure Vessels (Unfired) Rules, 1981** (SMPV) under Petroleum Act 1934 β for storage of LPG/nitrogen/CO2 above threshold quantities. **Gas Cylinder Rules, 2016** (G.S.R. 713(E) dated 14.09.2016) β manufacture/filling of gas cylinders. **Environment (Protection) Act, 1986** + EIA Notification 2006 (Schedule 1 Item 4(b) covers hazardous chemical plants; fire-equipment manufacturing with cylinder filling may attract Schedule 1 Item 7(d) for hazardous chemicals). **Factories Act, 1948** β Section 6 (approval of factory plans), Section 7 (licensing by State Chief Inspector of Factories). **Bureau of Indian Standards Act, 2016** β IS 2171 (portable fire extinguishers, CO2 type), IS 940 (soda-acid type), IS 2878 (water-type extinguisher), IS 15683 (BC/ABC dry powder), IS 14609 (DCP cartridge-operated), IS 2878-2004 β Quality Control Orders (QCOs) notified by DPIIT make BIS certification mandatory for fire extinguishers sold in India.. Our specialist-led team ensures full compliance with statutory documentation, eligibility verification, and expedited government approval.
Eligibility & thresholds
- Valid identity & address proof of applicant
- Active PAN & registered business premises
- Authorized representative authorization
- Compliant under applicable regulatory laws
- No pending statutory disqualifications
- Valid across authorized operational jurisdictions
- Pre-filing statutory documentation verification
- Official statutory fee schedule as per authority
- Mandatory periodic compliance filings post-approval
What's included
Everything in one transparent fee β no add-ons, no surprises.
Government charges only β separate from I-Pro's professional fee. All figures verified as of 25 August 2026.
| Fee Component | Amount (βΉ) | Basis / Authority |
|---|---|---|
| Fire Equipment Plant Setup Statutory Fee | βΉ10,000 - βΉ50,000 | Official government fee schedule (separate from professional fee)Statutory Authority |
| Total Government Fee | βΉ10,000 - βΉ50,000 | (for default assumptions stated below) |
Government charges only β separate from I-Pro's professional fee. Verified 25 August 2026.
Required documents
Each list identifies exactly what to provide β and what you do not need to submit. Use the accordions to expand.
- βΊEntity PAN + GSTIN. β Entity PAN + GSTIN.
- βΊConstitution document β Partnership Deed / MoA & AoA / LLP Agreement / Certificate of Incorporation. β Constitution document β Partnership Deed / MoA & AoA / LLP Agreement / Certificate of Incorporation.
- βΊTitle/lease document for manufacturing premises (β₯30 metres from any residential building for hazard β Title/lease document for manufacturing premises (β₯30 metres from any residential building for hazardous gas filling).
- βΊSite plan and building plan approved by local authority. β Site plan and building plan approved by local authority.
- βΊLayout of cylinder filling area, storage yard, fire-fighting system. β Layout of cylinder filling area, storage yard, fire-fighting system.
- βΊProcess flow diagram with hazardous materials inventory. β Process flow diagram with hazardous materials inventory.
- βΊList of equipment with safety devices (pressure relief valves, rupture discs). β List of equipment with safety devices (pressure relief valves, rupture discs).
- βΊCompetent person certificates for pressure vessels (under SMPV Rules 1981 Rule 4). β Competent person certificates for pressure vessels (under SMPV Rules 1981 Rule 4).
- βΊNOC from State Fire Service / Fire Advisor. β NOC from State Fire Service / Fire Advisor.
- βΊConsent to Establish from State Pollution Control Board under Water Act 1974 + Air Act β Consent to Establish from State Pollution Control Board under Water Act 1974 + Air Act
- βΊFactory Licence from State Chief Inspector of Factories (Form 2 under Factories Act 1948). β Factory Licence from State Chief Inspector of Factories (Form 2 under Factories Act 1948).
- βΊAuthorised signatory details with Aadhaar/PAN. β Authorised signatory details with Aadhaar/PAN.
How it works
Each step is labelled with who performs it β Customer, I-Pro, or the Regulator. Form names are linked to the official portal.
- 1Customerβ± 1 - 3 Days
Step 1: **I-Pro / Customer**
**I-Pro / Customer**: Identify type of fire-equipment manufacturing (cylinders, extinguishers, sprinklers, gas filling, etc.). - 2I-Proβ± 1 - 3 Days
Step 2: **I-Pro**
**I-Pro**: Apply for **land use approval** β local development authority / MIDC / State Industrial Corporation. - 3I-Proβ± 1 - 3 Days
Step 3: **I-Pro**
**I-Pro**: Apply for **Factory Licence** β State Chief Inspector of Factories (Form 1 plan approval; Form 2 licence). - 4I-Proβ± 1 - 3 Days
Step 4: **I-Pro**
**I-Pro**: Apply for **Consent to Establish** β State Pollution Control Board under Water Act 1974 + Air Act 1981. - 5I-Proβ± 1 - 3 Days
Step 5: **I-Pro**
**I-Pro**: Apply for **PESO Form B (Gas Cylinder Rules)** + **SMPV Form A** + **Petroleum Form XIII** on PESO online portal β submit plans and documents. - 6I-Proβ± 1 - 3 Days
Step 6: **PESO**
**PESO**: Scrutinises; conducts **joint inspection** with State Factory Inspector + Explosives Officer. - 7I-Proβ± 1 - 3 Days
Step 7: **PESO**
**PESO**: Issues licences β Form C (cylinder filling), SMPV Form B (storage), Form XIII (petroleum) β typically valid for **3 years** (renewable). - 8I-Proβ± 1 - 3 Days
Step 8: **Customer / I-Pro**
**Customer / I-Pro**: Apply for **BIS ISI mark** β submit type-test samples to BIS-approved lab; BIS conducts factory audit. - 9I-Proβ± 1 - 3 Days
Step 9: **BIS**
**BIS**: Issues **BIS Licence** (CM/L-XXXXX) for fire extinguisher per IS 2171/IS 15683. - 10Regulatorβ± 1 - 3 Days
Step 10: **I-Pro**
**I-Pro**: Counsel on continuing compliance β annual testing of cylinders, SMPV periodic inspection (every 2 years), BIS surveillance.
Post-registration compliance
What to file next. I-Pro handles these as part of the annual compliance package.
| Filing | Form | Deadline |
|---|---|---|
| Commencement of Business (Form INC-20A) Penalty: βΉ50,000 for company + βΉ1,000/day for directors (max βΉ1 Lakh) | One-time mandatory | Within 180 days of incorporation after bank capital deposit |
| First Auditor Appointment (Form ADT-1) Penalty: Statutory non-compliance; prosecution of defaulting officers | 5-year tenure | Within 30 days of incorporation by Board of Directors |
| Annual Financial Statements (Form AOC-4) Penalty: βΉ100 per day of delay per form with no statutory ceiling | Annual | Within 30 days of AGM (by 29 October annually) |
| Annual Return (Form MGT-7) Penalty: βΉ100 per day of delay per form with no statutory ceiling | Annual | Within 60 days of AGM (by 29 November annually) |
| Director KYC Verification (DIR-3 KYC) Penalty: βΉ5,000 statutory fee per DIN + deactivation | Annual | Every designated partner / director holding active DIN by 30 September |
Penalties for non-compliance
Statutory penalties under governing regulatory provisions. Avoid non-compliance delays.
| Non-compliance | Provision | Penalty |
|---|---|---|
| Commencement of Business (Form INC-20A) | One-time mandatory | βΉ50,000 for company + βΉ1,000/day for directors (max βΉ1 Lakh) |
| First Auditor Appointment (Form ADT-1) | 5-year tenure | Statutory non-compliance; prosecution of defaulting officers |
| Annual Financial Statements (Form AOC-4) | Annual | βΉ100 per day of delay per form with no statutory ceiling |
| Annual Return (Form MGT-7) | Annual | βΉ100 per day of delay per form with no statutory ceiling |
| Director KYC Verification (DIR-3 KYC) | Annual | βΉ5,000 statutory fee per DIN + deactivation |
Common mistakes to avoid
Avoidable filing errors that cause delays or rejection. Each can be resolved before submission.
- 1Mismatched applicant legal name or identity details across KYC proofsWhy: Government verification APIs cross-check with UIDAI and MCA databases and automatically flag discrepancies in spelling or dates.Fix: Our specialists pre-validate your documents against official government databases before portal filing.
- 2Submitting outdated utility bills or non-notarized commercial leasesWhy: Premises proofs older than 60 days or defective landlord NOCs trigger statutory scrutiny queries and multi-week processing delays.Fix: We verify recent billing dates and provide pre-formatted, legally vetted landlord NOC and lease formats.
- 3Selecting incorrect classification, turnover slab, or statutory activity codeWhy: Applications filed under inappropriate classifications attract show-cause notices and potential rejection without statutory fee refund.Fix: We conduct a statutory scope assessment to align your application with the exact regulatory requirements.
Frequently asked questions
Everything you need to know about this service.
Client feedback
What clients say
Real reviews from founders, finance leads and operators who used our Fire Equipment Plant Setup service.
No reviews yet
Be the first to share your experience with Fire Equipment Plant Setup.
Recommended Bundles
Instead of buying these services separately, get them together as a package.
Industrial Premises Premium Pack
Factory + Building NOC + Fire + BOCW + Trade license + ISO 45001 β full industrial premises compliance.
What's included
Premises Compliance Growth Pack
Factory license + Building NOC + Trade license + Shop establishment + Legal metrology.
What's included
Local Licenses Starter Pack
Shop establishment + Trade license + Health trade license β minimum to open a shop.