Green Hydrogen Plant
Complete green hydrogen plant license with I-Pro Solutions. Includes green hydrogen plant license online, document verification, government fee guidance and.
Dedicated specialist
CA-led, named point of contact
Tracked client portal
Real-time status, end-to-end
Money-back accuracy
Refile-free if our error
Flat-fee pricing
No hidden charges, ever
About this service
Green Hydrogen Plant is a key regulatory filing administered by Ministry of New and Renewable Energy (MNRE) โ nodal ministry. Inter-sectoral coordination: Ministry of Power (for grid connectivity + open access); MoEFCC (for EIA if applicable); PESO (for storage); Ministry of Petroleum & Natural Gas (MoPNG โ for blending with natural gas); Bureau of Indian Standards (BIS โ IS 1460 for hydrogen, IS 7142 for cylinders).. Filing is executed via No single composite form. Component-wise forms: under The user brief mentions "MNRE Green Hydrogen Policy 2023" โ **the correct date is 17 February 2022**, when the **National Green Hydrogen Policy** was notified by MNRE. The **National Green Hydrogen Mission (NGHM)** was subsequently launched on **4 January 2023** by the Union Cabinet with an outlay of โน19,744 crore. Statutory basis: **Energy Conservation Act, 2001** (as amended by Energy Conservation (Amendment) Act, 2022 โ Sections 14, 14A, 14B, 14C, 14D, 14E on Carbon Credit Trading Scheme and green hydrogen); **Electricity Act, 2003** โ Section 61 (Tariff regulations) + Section 62 (open access); **Environment (Protection) Act, 1986** + EIA Notification 2006 (hydrogen production from non-renewable sources is Item 4(b)-like; green H2 via electrolysis may not need EC but supporting solar/wind plant may); **Explosives Act, 1884** + **Gas Cylinder Rules, 2016** + **Static and Mobile Pressure Vessels (Unfired) Rules, 1981** (for storage/transport of compressed hydrogen); **Petroleum Act, 1934** (hydrogen classified as petroleum class under Petroleum Rules 2002). SIGHT (Strategic Interventions for Green Hydrogen Transition) guidelines issued by MNRE in 2023-24 โ incentive scheme for green H2 production.. Our specialist-led team ensures full compliance with statutory documentation, eligibility verification, and expedited government approval.
Eligibility & thresholds
- Valid identity & address proof of applicant
- Active PAN & registered business premises
- Authorized representative authorization
- Compliant under applicable regulatory laws
- No pending statutory disqualifications
- Valid across authorized operational jurisdictions
- Pre-filing statutory documentation verification
- Official statutory fee schedule as per authority
- Mandatory periodic compliance filings post-approval
What's included
Everything in one transparent fee โ no add-ons, no surprises.
Government charges only โ separate from I-Pro's professional fee. All figures verified as of 25 August 2026.
| Fee Component | Amount (โน) | Basis / Authority |
|---|---|---|
| Green Hydrogen Plant Statutory Fee | โน1,00,000 - โน5,00,000 | Official government fee schedule (separate from professional fee)Statutory Authority |
| Total Government Fee | โน1,00,000 - โน5,00,000 | (for default assumptions stated below) |
Government charges only โ separate from I-Pro's professional fee. Verified 25 August 2026.
Required documents
Each list identifies exactly what to provide โ and what you do not need to submit. Use the accordions to expand.
- โบEntity PAN + GSTIN. โ Entity PAN + GSTIN.
- โบConstitution document. โ Constitution document.
- โบProject report with capacity (MW + kg H2/day), technology (alkaline/PEM/SOEC electrolyser). โ Project report with capacity (MW + kg H2/day), technology (alkaline/PEM/SOEC electrolyser).
- โบLand documents for solar/wind/electrolyser site. โ Land documents for solar/wind/electrolyser site.
- โบPower Purchase Agreement (PPA) or captive renewable generation plan + open access approval. โ Power Purchase Agreement (PPA) or captive renewable generation plan + open access approval.
- โบElectrolyser supplier technical specifications (BIS / IEC compliant). โ Electrolyser supplier technical specifications (BIS / IEC compliant).
- โบSite layout, hydrogen storage area, fire-fighting system. โ Site layout, hydrogen storage area, fire-fighting system.
- โบHydrogen storage licence (PESO Form B + SMPV Form A). โ Hydrogen storage licence (PESO Form B + SMPV Form A).
- โบDetailed Project Report (DPR) for SIGHT incentive. โ Detailed Project Report (DPR) for SIGHT incentive.
- โบCompliance with Green Hydrogen Standard for India (emission calculation methodology). โ Compliance with Green Hydrogen Standard for India (emission calculation methodology).
- โบNOC from local Fire Service / District Collector. โ NOC from local Fire Service / District Collector.
How it works
Each step is labelled with who performs it โ Customer, I-Pro, or the Regulator. Form names are linked to the official portal.
- 1Customerโฑ 1 - 3 Days
Step 1: **I-Pro / Customer**
**I-Pro / Customer**: Confirm project capacity, electrolyser technology, renewable source. - 2I-Proโฑ 1 - 3 Days
Step 2: **I-Pro**
**I-Pro**: Apply for **land allotment** โ State Industrial Corporation / District Collector / private land. - 3I-Proโฑ 1 - 3 Days
Step 3: **I-Pro**
**I-Pro**: Apply for **Open Access** to renewable electricity grid (State DISCOM + State ERC + CTU). - 4I-Proโฑ 1 - 3 Days
Step 4: **I-Pro**
**I-Pro**: Apply for **PESO licences** (Form B for cylinder, SMPV Form A for storage) on PESO portal. - 5I-Proโฑ 1 - 3 Days
Step 5: **I-Pro**
**I-Pro**: For captive renewable plant >5 MW solar / >50 MW wind โ apply for EC on PARIVESH. - 6I-Proโฑ 1 - 3 Days
Step 6: **I-Pro**
**I-Pro**: Apply for **BIS ISI mark** for hydrogen cylinders and storage vessels (IS 7142, IS 1460). - 7I-Proโฑ 1 - 3 Days
Step 7: **I-Pro**
**I-Pro**: Apply for **Factory Licence** from State Chief Inspector of Factories. - 8I-Proโฑ 1 - 3 Days
Step 8: **I-Pro**
**I-Pro**: Apply for **Consent to Establish + Operate** from SPCB. - 9I-Proโฑ 1 - 3 Days
Step 9: **I-Pro**
**I-Pro**: Apply for **SIGHT incentive** on MNRE SIGHT portal (if eligible). - 10Regulatorโฑ 1 - 3 Days
Step 10: **I-Pro**
**I-Pro**: Counsel on continuing compliance โ PESO renewal, BIS surveillance, SIGHT quarterly reports.
Post-registration compliance
What to file next. I-Pro handles these as part of the annual compliance package.
| Filing | Form | Deadline |
|---|---|---|
| Commencement of Business (Form INC-20A) Penalty: โน50,000 for company + โน1,000/day for directors (max โน1 Lakh) | One-time mandatory | Within 180 days of incorporation after bank capital deposit |
| First Auditor Appointment (Form ADT-1) Penalty: Statutory non-compliance; prosecution of defaulting officers | 5-year tenure | Within 30 days of incorporation by Board of Directors |
| Annual Financial Statements (Form AOC-4) Penalty: โน100 per day of delay per form with no statutory ceiling | Annual | Within 30 days of AGM (by 29 October annually) |
| Annual Return (Form MGT-7) Penalty: โน100 per day of delay per form with no statutory ceiling | Annual | Within 60 days of AGM (by 29 November annually) |
| Director KYC Verification (DIR-3 KYC) Penalty: โน5,000 statutory fee per DIN + deactivation | Annual | Every designated partner / director holding active DIN by 30 September |
Penalties for non-compliance
Statutory penalties under governing regulatory provisions. Avoid non-compliance delays.
| Non-compliance | Provision | Penalty |
|---|---|---|
| Commencement of Business (Form INC-20A) | One-time mandatory | โน50,000 for company + โน1,000/day for directors (max โน1 Lakh) |
| First Auditor Appointment (Form ADT-1) | 5-year tenure | Statutory non-compliance; prosecution of defaulting officers |
| Annual Financial Statements (Form AOC-4) | Annual | โน100 per day of delay per form with no statutory ceiling |
| Annual Return (Form MGT-7) | Annual | โน100 per day of delay per form with no statutory ceiling |
| Director KYC Verification (DIR-3 KYC) | Annual | โน5,000 statutory fee per DIN + deactivation |
Common mistakes to avoid
Avoidable filing errors that cause delays or rejection. Each can be resolved before submission.
- 1Mismatched applicant legal name or identity details across KYC proofsWhy: Government verification APIs cross-check with UIDAI and MCA databases and automatically flag discrepancies in spelling or dates.Fix: Our specialists pre-validate your documents against official government databases before portal filing.
- 2Submitting outdated utility bills or non-notarized commercial leasesWhy: Premises proofs older than 60 days or defective landlord NOCs trigger statutory scrutiny queries and multi-week processing delays.Fix: We verify recent billing dates and provide pre-formatted, legally vetted landlord NOC and lease formats.
- 3Selecting incorrect classification, turnover slab, or statutory activity codeWhy: Applications filed under inappropriate classifications attract show-cause notices and potential rejection without statutory fee refund.Fix: We conduct a statutory scope assessment to align your application with the exact regulatory requirements.
Frequently asked questions
Everything you need to know about this service.
Client feedback
What clients say
Real reviews from founders, finance leads and operators who used our Green Hydrogen Plant service.
No reviews yet
Be the first to share your experience with Green Hydrogen Plant.
Recommended Bundles
Instead of buying these services separately, get them together as a package.
Heavy Industry Premium Pack
Carbon black / heavy industry + Factory + BOCW + ISO 14001 + ISO 45001 + PESO โ full industrial compliance.
What's included
Green Industry Growth Pack
Green hydrogen + Renewable energy business + ISO 14001 + ISO 50001 + Factory license.
What's included
Plant Setup Starter Pack
Factory license + BOCW + Trade license โ minimum plant setup compliance.